Heathrow Airport Reveals Expansion Plans in Anticipation of Third Runway

Jun 18, 2019

This post contains references to products from one or more of our advertisers. We may receive compensation when you click on links to those products. Terms apply to the offers listed on this page. For an explanation of our Advertising Policy, visit this page.

In advance of the planned third runway expected to open by 2026, London Heathrow Airport (LHR) has unveiled a long-term masterplan to expand the airport to cope with the increased flights the third runway will bring.

This plan, which has already been approved by the British parliament, is expected to be complete by 2050. A new runway bridge will be built over the M25 motorway which will provide spectacular views of the world’s biggest aircraft at Europe’s busiest airport while motorists drive underneath. It presents significant engineering and design challenges given the weight of these fully-laden planes. The M25, which is Britain’s busiest motorway, will move up to 150 metres west to accommodate the third runway.

Terminals 2 (Star Alliance) and 5 (British Airways and Iberia) will be extended in a ‘toaster rack’ design with central check-in areas followed by many rows of piers of gates. There will also be an enormous new 24,000 capacity carpark in the Sipson town area.

Heathrow Expansion Masterplan. Photo by Grimshaw Architects

The frustrating curfew will remain, with a 6.5 hour ban on scheduled flights each evening. The masterplan sees the introduction of a vehicle access charge for the airport precinct, as already introduced in Central London.

The plan is now under a three months public consultation. Heathrow Airport insists that the expansion “must not come at any cost,” so they will work closely with local communities to ensure growth is sustainable and responsible. There are plenty who are opposed to the expansion, from local residents to environmentalists. Boris Johnson, the current front-runner to become the next Prime Minister, was a vocal opponent of the airport’s expansion though he has now signaled that he will not oppose the plans given they have already been approved by Parliament.

Image by Grimshaw Architects.

The expansion costs are estimated by Heathrow airport to cost £14 billion in total, although opponents say this figure will be closer to £30 billion.

Featured image by Grimshaw Architects.

Bank of America® Premium Rewards® Visa® credit card

This card from Bank of America gets really interesting if you have a BofA checking, savings or investment account. Depending on the value of your combined accounts you can potentially get as much as 3.5x points on travel/dining and 2.625x points on other purchases making it the richest consumer banking bonus out there.

Apply Now
More Things to Know
  • Receive 50,000 bonus points – a $500 value – after you make at least $3,000 in purchases in the first 90 days of account opening
  • Earn unlimited 2 points for every $1 spent on travel and dining purchases and unlimited 1.5 points per $1 spent on all other purchases
  • If you're a Bank of America Preferred Rewards member, you can earn 25%-75% more points on every purchase
  • No limit to the points you can earn and your points don't expire
  • Redeem for cash back as a statement credit, deposit into eligible Bank of America® accounts, credit to eligible Merrill accounts, or gift cards or purchases at the Bank of America Travel Center
  • Get up to $200 in combined airline incidental and airport expedited screening statement credits + valuable travel insurance protections
  • No Foreign Transaction Fees
  • Low $95 annual fee
Intro APR on Purchases
N/A
Regular APR
17.74% - 24.74% Variable APR on purchases and balance transfers
Annual Fee
$95
Balance Transfer Fee
Either $10 or 3% of the amount of each transaction, whichever is greater.
Recommended Credit
Excellent/Good

Editorial Disclaimer: Opinions expressed here are the author’s alone, not those of any bank, credit card issuer, airlines or hotel chain, and have not been reviewed, approved or otherwise endorsed by any of these entities.

Disclaimer: The responses below are not provided or commissioned by the bank advertiser. Responses have not been reviewed, approved or otherwise endorsed by the bank advertiser. It is not the bank advertiser’s responsibility to ensure all posts and/or questions are answered.